Meter box installation instructions

Add time: 2013/3/7 16:25:32│ Views:6045

Installation environment
●Ambient temperature -25 ℃ ~ +50 ℃, and the average temperature within 24 hours does not exceed +35 ℃。
●Air cleaning, the average daily relative humidity does not exceed 95%, the average monthly value of not more than 90%。
●Meter box should be mounted vertically, the tilt angle of not more than 5 °。
●Installation location should be selected without severe vibration, impact and not enough to corrosion of electrical components。
●Because the meter box materials used are not resistant to alkali, oxidizing acids and amines, ketones, dissolved in chlorinated hydrocarbons and aromatic solvents, should avoid contact with these chemicals or together。
●During use, the surface of the meter box should be maintained and cleaned, and sharp objects and hard objects should be avoided to scratch and scratch the surface of the meter box。
●To extend the meter box and the opening of the life of the meter, meter box installation should try to choose a cool dry bath place, to avoid direct sunlight for a long time, suitable for indoor installation. Outside the top of the box should be covered shelter to prevent the storm when the storm wall soaked in flushing。
Installation Notes
●Meter box Used to fix the wall or cross arm on the fixed position are located inside the box, so the box must be opened before installation, first remove the middle of the meter box under the two cover fixing screws, and then follow the prompts to open Box。
●According to the installation hole position, install the hole in the corresponding wall position, place the expansion pipe, then fix the base to the wall, install the cover。
●If the meter box outdoor installation in a non-recommended installation location, please install the meter box, and then install the manufacturer's recommended installation of outdoor special installation of modular shelter。

Combined awning
●First of all, according to the meter box width, the combination of the appropriate number of shelters, shelter combinations for the self-button。
●Open the installed meter box, exit the fixed screws on the upper row of the meter box 2-4mm, push the upper part of the meter box outward to leave a 2-4mm gap between the box body and the wall, then insert the combined canopy into the gap and press Flat, and finally tighten the meter box screws, close the meter box cover。
●When installing a canopy in a gale area, install a screw-fastening canopy at the screw hole above the canopy or with a M4 × 20 self-tapping screw on the cabinet。